Short answer: Yes. The Boiler Upgrade Scheme now lists £2,500 towards an eligible air to air heat pump in a home in England or Wales. The system must replace fossil fuel or electric heating and be fitted by an MCS certified installer. As of 20 October 2026, the Energy Saving Trust says no installers are yet MCS certified for air to air.
What changed
For years, the Boiler Upgrade Scheme, or BUS, only paid towards air to water and ground source heat pumps and biomass boilers. Air to air systems, the reversible units that look like air conditioning, were left out. That has changed.
The Energy Saving Trust reports that the government announced the expansion in November 2025, and the gov.uk scheme page, updated in October 2026, now lists:
| Technology | BUS grant |
|---|---|
| Air source (air to water) heat pump | £7,500 |
| Ground source heat pump | £7,500 |
| Biomass boiler | £5,000 |
| Air to air heat pump | £2,500 |
You can get one grant per property. Hybrid systems, such as a gas boiler working with a heat pump, are not eligible.
Who qualifies
Ofgem, which runs the scheme, sets the rules. In short:
- the property must be in England or Wales
- for air to air, it must be residential: non residential buildings are excluded
- the installer must be certified by the Microgeneration Certification Scheme (MCS)
- the new system must replace an existing fossil fuel or electric heating system
- it must not replace an existing low carbon system
- a heat pump must be sized to meet the property’s full space heating needs
- new builds are excluded, apart from some self builds
- social housing, including shared ownership, is excluded
- the property must not already have had government or ECO funding for the same system
The grant is installer led. Your installer applies, Ofgem contacts you to confirm consent, and the grant should appear as a discount on your quote. The installer then has three months from approval to finish the job.
The catch: MCS certification for air to air
This is the part that matters for anyone planning an install now. According to the Energy Saving Trust, updated on 20 October 2026, there are currently no MCS certified installers for air to air heat pumps, and MCS expects certification to be available before the end of 2026. Until installers and products are certified, nobody can make a grant funded air to air installation.
What that means in practice:
- if you want the £2,500, you will need to wait until MCS certified air to air installers appear on the MCS find an installer tool
- if you install now with a non MCS installer, you will not be able to claim the grant later for that system
- if you need cooling before next summer and are happy to pay in full, you can go ahead now
The Energy Saving Trust also notes that the scheme may not include every type of air to air system, though it expects the most common ones to be covered.
Why this matters in London
Air to air heat pumps suit the kind of homes London has most of. Over half of London households live in flats, and some London flats, particularly in purpose built blocks, are heated by electric storage or panel heaters. They have no radiators to connect an air to water heat pump to and no room for a large outdoor unit or cylinder upgrade. A reversible air to air system can replace electric heaters with something far more efficient and give cooling in summer as well.
That said, flats bring their own steps before any grant: freeholder consent, and usually planning permission, because permitted development only allows one heat pump on a whole block. Our Westminster area page explains how that works in conservation areas and mansion blocks.
Heating first, cooling second
To qualify, the system must be designed to heat your home through winter. That is a different design from a cooling first air conditioner:
- it is sized for the coldest days, using a heat loss calculation for each room
- it has to replace your existing heating, not sit alongside it
- you need a separate plan for hot water, because most air to air systems do not heat water
A system designed for heating also fits the planning rules better: in England, a heat pump can be permitted development under Class G only if it is not used solely for cooling.
VAT
Ofgem’s page says there is 0% VAT on installing energy saving materials, including heat pumps, from 1 April 2022 to 31 March 2027. Ask your installer to confirm how it applies to the system you are buying. Cooling only air conditioning is not a heat pump installation in this sense.
What to do now
- Decide whether heating is a main goal. If you only want summer cooling, the grant is not for you.
- Get a survey and a heat loss based design so you know what a qualifying system would look like.
- Check your lease and talk to the freeholder if you are in a flat.
- Watch the MCS installer listings for air to air certification.
- Compare the cost of waiting with the cost of another hot summer.
Our air to air heat pump page explains how these systems work, and our guide to air to air vs air to water helps you choose between them.
Quick questions
How much is the air to air heat pump grant?
The Boiler Upgrade Scheme lists £2,500 towards an air to air heat pump. Air to water and ground source heat pumps get £7,500.
Can I get the grant for air conditioning?
Not for cooling only air conditioning. Only eligible air to air heat pump systems, designed to heat the home and installed by an MCS certified installer, qualify.
Can I claim the grant now?
The grant exists, but you need an MCS certified installer to apply. As of October 2026 the Energy Saving Trust says MCS certification for air to air installers is not yet available and is expected before the end of 2026.
Does the grant cover flats?
Residential properties in England and Wales can be eligible, including flats, as long as the other rules are met. Social housing and most new builds are excluded.
Last updated 23 October 2026. Written for homes in London. Rules can change, so check the linked sources for the latest position.